Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

联系我们

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Lift platform
相关产品RELATED PRODUCTSMORE
Customized large tonnage lifting platform
  • Customized large tonnage lifting platform

Customized large tonnage lifting platform

Category:Lift platform

Product specifications:

Details

Product Introduction:

Fixed Heavy-Load Lifts Have Large Load Capacity, Stable Operation, And Generally Have Large Working Surfaces. They Are Simple And Reliable To Operate, Have A Solid Structure, Are Easy To Install And Maintain, And Have A Long Service Life. The Hydraulic System Of The Product Is Equipped With Anti-Fall And Synchronization Devices. Different Table Forms Such As Flat, Roller, And Telescopic Can Be Made According To User Requirements. Power Failure Can Be Achieved By Manual Descent, And An Emergency Stop Button Is Provided, Which Is Convenient, Fast, And Practical. This Product Is Mainly Used In Enterprise Production Lines, Warehousing, Logistics, Shopping Malls, Stations, Docks And Other Places. The Main Rotating Parts Use Wear-Resistant Composite Bushings And Needle Bearings, Which Can Reduce The Wear Between The Support Rod And The Support Rod Pin, Thereby Extending The Service Life Of The Equipment.









Parameters:

Designed According To User Requirements, The Load Capacity Can Reach 80T.

Product Application:

 1. The Hydraulic Lifting Platform (Referred To As The Platform) Has Been Inspected Before Leaving The Factory, And All Technical Indicators Have Met The Design Requirements. When In Use, Only The Ground Wire Needs To Be Connected, And The Hydraulic And Electrical Systems Do Not Need To Be Adjusted. 2. Before Using The Platform, Carefully Check The Hydraulic And Electrical Systems To Ensure That There Is No Leakage Or Exposure. 3. The Platform Should Be Kept In An Unloaded State Before Lifting. After The Power Is Turned On, The Power Indicator Light Is On, Turn On The Total Stop Button; Press The Motor Start Button. . 4. Press The Rise (Green) Button To Observe Whether The Platform Has Any Response, And Let The Motor Run Idle For 3-5 Minutes. If It Does Not Rise, The Motor Reverses, Cuts Off The Power, And Exchanges The Two Phases Of The Motor. 5. Press The Rise Button (Green Indicator Light), The Platform Starts To Rise, And When It Reaches The Required Height, The Platform  Automa

Product Knowledge:

I. Precautions 1. When The Platform Is Installed And Used, The Work Surface Should Be Kept Horizontal. 2. During The Lifting Process Of The Platform, It Is Strictly Forbidden For All Personnel To Climb. If Maintenance Is Required, The Platform Should Be Firmly Secured After It Is Raised. 3. It Is Strictly Forbidden To Overload The Platform During Use. The Items Carried Should Be Placed In The Center Of The Work Surface And Must Not Be Moved Or Overloaded. 4. The Hydraulic Oil Used Should Be Kept Clean And Must Not Be Mixed With Water And Other Impurities. 5. When The Platform Fails, The Power Supply Should Be Cut Off In Time For Maintenance. II. Maintenance 1. The Lift Is A Scissor Lift, And Its Rotating Part Is Connected By A Shaft Pin And A Shaft Sleeve. In Order To Reduce Friction, There Is A Grease Nozzle For Filling Lubricating Grease At The End Of The Shaft Pin. The Platform Must Be Filled With Lubricating Grease After 80 Hours Of Use, About 10 Days. 2. The Lift Is Added With Hydrau

{29}{30}

Links