Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

联系我们

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Company News

Maintenance methods for hydraulic lifting platform

Source: Time:2020-02-11 09:02:41 views:

Maintenance methods for hydraulic lifting platform

Maintenance methods for hydraulic lifting platforms:

1、 Regulations on maintenance time for hydraulic lifting platforms (gu ī d ì ng):

1. Daily maintenance.

After working for 1500 hours, perform minor repairs on the mechanical and electrical systems of the elevator.

3. After 5000 hours of operation of the elevator, perform intermediate repairs on the mechanical and electrical systems.

After 10000 hours of operation, the elevator will undergo major repairs to its mechanical and electrical systems.

2、 Maintenance and upkeep of hydraulic lifting platform mechanical equipment:

1. The brakes of each institution should be regularly inspected and adjusted for the clearance between the brake pads and brake wheels to ensure flexibility and reliability. There should be no dirt on the friction surface, and any dirt must be washed away with gasoline or thinner.

2. The lubrication of various parts such as gearbox, gearbox, external gear, and hydraulic oil shall be carried out according to the requirements in the lubrication table.

3. Pay attention to checking whether there are broken wires and loose strands in each part of the steel wire rope. If it exceeds the relevant regulations, it must be replaced immediately. The maintenance and upkeep of steel wire ropes should strictly follow the provisions of GB514485.

4. Regularly check the connection of each part, and tighten if there is any looseness. The tightness of the connecting bolts of the machine body should be checked when the machine body is under pressure. All connecting shafts must have open pins and be fully opened. Flange ball valve

5. Regularly check whether each organization is operating normally and whether there is any noise. If any faults are found, they must be promptly eliminated.

When installing, disassembling, and adjusting the rotary mechanism, attention should be paid to ensuring that the centerline of the reducer of the rotary mechanism is parallel to the centerline of the gear, and its meshing surface is not less than 70%. The meshing clearance should be suitable.

7. Regularly check all wires and cables for damage. Timely bandage and replace the damaged parts.

8. If the motor overheats, it should be stopped in a timely manner, and the fault should be removed before continuing to operate. The motor bearings should be well lubricated.

9. The contact surface of each part of the electric brush should be kept clean, and the brush pressure should be adjusted to ensure that the contact area is not less than 50%.

10. Keep control boxes, distribution boxes, etc. clean regularly and promptly remove dust from electrical equipment.

Hydraulic lifting platform; Maintenance and upkeep

{18}

Links